Gilbert Pro Stucco
Two-story cream stucco house with red clay tile roofs, arched windows, a wall lantern and a palm in late afternoon sun

Gilbert, AZ New stucco

Stucco Contractor in Gilbert AZ

Gilbert Pro Stucco is a stucco contractor in Gilbert AZ for new stucco on houses that already have it: room additions, casitas, garage conversions, enclosed patios and new walls. New three-coat stucco runs $6.36 to $9.66 per square foot installed in This Old House's 2026 guide, built the way the code describes, 7/8 inch over lath, with the finish matched into the existing wall.

$6.36 to $9.66 per sq ft
New three-coat stucco, installed (This Old House, 2026).
7/8 inch, 3 coats
Stucco over lath: scratch, brown and finish (ASTM C926).
4 inches
Minimum height of the weep screed above soil (IRC R703.7).

New stucco in Gilbert AZ: what a stucco contractor builds

New stucco is a wall system, not a coating: paper, lath, accessories and three coats of cement plaster that together keep rain out and let what gets in drain back out at the bottom. Most of the new stucco on Gilbert houses goes on these jobs:

  • Room additions and second-story additions finished to match the house.
  • Casitas and guest suites built behind the main house.
  • Garage conversions, where the old garage door opening becomes a stucco wall with a window.
  • Enclosed patios and covered patio walls.
  • New site walls, columns and pool equipment screens tied to the house (block walls have their own page).
Two workers on scaffolding along a long wall covered in black building paper and wire lath
Two workers lathing a long wall from scaffolding.

The stucco system the code describes

Gilbert builds on the 2018 International Residential Code, and its exterior plaster section, R703.7, points to the two national standards for stucco: ASTM C926 for the plaster and ASTM C1063 for the lath and accessories. The pieces that matter most on a new wall:

New cement stucco on a framed wall: the parts and where they come from
PartRequirementSource
Water-resistive barrierTwo layers of 10-minute Grade D paper, or 60-minute paper with a separating layer, over wood sheathingIRC R703.7 (2021 text)
LathCorrosion-resistant wire or expanded metal, per ASTM C1063IRC R703.7
Weep screed0.019 in minimum, 3-1/2 in flange, 4 in above soil or 2 in above pavingIRC R703.7
Coats over lathThree: scratch 3/8 in, brown 3/8 in, finish 1/8 in, 7/8 in totalIRC R703.7; ASTM C926 Table 4
Coats over block or concreteAt least twoIRC R703.7
Control jointsPanels of 144 sq ft or less, no more than 18 ft apartASTM C1063 (as quoted by Walls & Ceilings)
Application temperatureAbove 40°F; protected from fast drying in hot, dry windASTM C926 7.9

IRC R703.7 as printed in the 2021 edition (the coat counts and weep screed match the 2018 edition the Town builds on); ASTM C926-20a; ASTM C1063 control-joint limits as quoted in Walls & Ceilings (May 2014). The Town's amendments can add to these; plan review has the final word.

Why the weep screed matters here

The weep screed is the metal edge at the bottom of the wall that lets water behind the stucco drain out. Buried by landscaping rock or soil, or stuccoed down to the slab, it can't do that, and the bottom of the wall stays wet every time the sprinklers run. On an addition, the new screed should sit at least 4 inches above soil or 2 inches above paving, and the landscaping should stay below it.

Wall covered in black building paper and galvanized wire lath around two white windows, ready for the first coat of stucco
Building paper and wire lath around two windows, before the first coat.

How new stucco goes on

  1. 1
    Check the permit and the HOA

    An addition or casita goes through the Town's plan review and the community's design review before the walls are wrapped; the stucco color and texture are part of the HOA submittal.

  2. 2
    Wrap and flash the framing

    Water-resistive barrier goes on shingle-fashion over the sheathing, window and door flashing is lapped into it, and the weep screed is set at the foot of the wall.

  3. 3
    Lath and accessories

    Corrosion-resistant wire or expanded metal lath is fastened over the paper, with casing beads at openings and control joints laid out so panels stay within ASTM C1063 limits.

  4. 4
    Scratch and brown coats

    The scratch coat is pushed into the lath and scored; the brown coat builds the wall flat to the screeds. In dry heat each coat is misted and the next follows as soon as the first is firm.

  5. 5
    Finish coat and tie-in

    The finish coat goes on in the house's texture, carried to a corner or joint where it meets the old wall, so the new and old stucco read as one.

In Gilbert's heat the base coats are the hard part. ASTM C926 says hot or dry weather shortens the time between coats and that pre-wetting the base reduces its absorption, and it calls for fog-spraying fresh plaster, "generally twice daily in the morning and evening", more often when it's hot, dry and windy. Summer stucco jobs are scheduled around that.

What new stucco costs on a Gilbert addition

New stucco is priced on wall area, with openings counted as wall by most estimators. On an addition, the tie-in to the old wall and the finish match are part of the job:

For whole houses, the cost to stucco a house page runs the numbers for 1,500, 2,000 and 2,500 square foot homes.

Hard coat, synthetic and foam trim

Most new stucco on Gilbert additions matches the house: cement stucco, often with foam trim bands at the windows and roof line. Synthetic stucco (EIFS) is a different system with its own code section and its own failure modes; the EIFS vs stucco guide explains the difference, and the foam trim repair page covers the trim.

Get a Free Quote

Tell us what the wall is doing and where the house is. The quote is free.

Stucco Contractor in Gilbert: Questions

New two-story homes under construction in Gilbert, with a gray base coat of stucco upstairs, plasterers on scaffolds and foam trim at the windows
New Gilbert homes with the gray base coat on and foam trim at the windows.

Is stucco a concrete or cement?

Stucco is a cement plaster, not concrete. Traditional stucco is portland cement, lime, sand and water applied in coats over lath or masonry, while concrete is cement with coarse gravel cast into forms. ASTM C926 calls it portland cement-based plaster; synthetic stucco (EIFS) is a different, acrylic-based system over foam board.

How much does new stucco cost per square foot?

New three-coat stucco runs $6.36 to $9.66 per square foot installed in This Old House's 2026 guide (built on Homewyse data), and Homewyse's own May 2026 national estimate for three-coat stucco over paper and lath is $10.69 to $17.33. An addition's price also carries the paper, lath, trims and the work to tie into the existing wall.

Can new stucco match my existing house?

Close enough that no one notices, if it's done right: the finish coat is matched to the existing texture and the new work ends at a corner, a joint or a trim band instead of in the middle of a wall. The color matches best when the whole elevation gets a new finish coat, since the old wall has weathered.

Do I need a permit for stucco on an addition in Gilbert?

The addition itself goes through the Town's building permit, and the stucco is part of that job. The paper, lath and weep screed disappear under the coats, so on permitted work they're normally inspected before plastering; ask which inspections your permit lists. Gilbert Development Services is at (480) 503-6700, and the permit guide has more.

How long does new stucco take to cure?

The coats firm up in hours to a day each, faster in Gilbert's dry heat, but cement stucco keeps gaining strength for weeks. LaHabra, for example, says its color coat normally sets the same day and allows 28 days for curing, and fresh stucco is misted in hot, dry weather so it doesn't dry out too fast.

What is one-coat stucco?

A factory-blended base coat applied in one pass over lath, with the finish coat on top, instead of separate scratch and brown coats. This Old House puts one-coat systems at about $3 to $9.75 per square foot and says they can cut project time roughly in half; they're installed to the maker's evaluation report rather than the three-coat table.

Adding on in Gilbert?

Send the project, the wall area if you know it and the address. The quote is free.

Get a Free Quote